FAS 1378-CH 10 over Spoon River
GoodStark County, Illinois · S.CTR-23-T12NR6E · Structure no. 088341000000000
- Built
- 1977
- 48 years old
- Condition
- Good
- inspected October 2022
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 207 ft
- 3 main spans
- Daily traffic
- 150
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
FAS 1378-CH 10 over Spoon River is a steel continuous stringer/multi-beam or girder carrying FAS 1378-CH 10 over Spoon River in Stark County, Illinois. It was built in 1977, so it is 48 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 29% of them trucks, projected to reach 202 by 2046. The structure is 207 ft (63.1 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 1378-CH 10 over Spoon River built?
It was built in 1977, making it 48 years old in 2025.
What condition is FAS 1378-CH 10 over Spoon River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.
How much traffic does FAS 1378-CH 10 over Spoon River carry?
About 150 vehicles per day (2023 count), of which roughly 29% are trucks.
How long is FAS 1378-CH 10 over Spoon River?
The structure is 207 ft (63.1 m) long with a longest span of 75 ft (22.9 m) and a deck 30 ft wide.
Who owns FAS 1378-CH 10 over Spoon River?
It is owned by the Town or Township Highway Agency.