FAS 373 - Ch 4 over Spoon River
FairStark County, Illinois · NW-33-T12NR6E · Structure no. 088320400000000
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected October 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 162 ft
- 3 main spans
- Daily traffic
- 100
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 373 - Ch 4 over Spoon River is a prestressed concrete box beam or girders - multiple carrying FAS 373 - Ch 4 over Spoon River in Stark County, Illinois. It was built in 1984, so it is 41 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 46% of them trucks, projected to reach 101 by 2046. The structure is 162 ft (49.4 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 373 - Ch 4 over Spoon River built?
It was built in 1984, making it 41 years old in 2025.
What condition is FAS 373 - Ch 4 over Spoon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2022.
How much traffic does FAS 373 - Ch 4 over Spoon River carry?
About 100 vehicles per day (2023 count), of which roughly 46% are trucks.
How long is FAS 373 - Ch 4 over Spoon River?
The structure is 162 ft (49.4 m) long with a longest span of 60 ft (18.3 m) and a deck 28 ft wide.
Who owns FAS 373 - Ch 4 over Spoon River?
It is owned by the County Highway Agency.