FAS 637 (ch 21) over Br of Flat Branch
GoodShelby County, Illinois · 2 MI E of Moweaqua · Structure no. 087360100000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 800
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 637 (ch 21) over Br of Flat Branch is a prestressed concrete box beam or girders - multiple carrying FAS 637 (ch 21) over Br of Flat Branch in Shelby County, Illinois. It was built in 2023, so it is 2 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 800 vehicles a day, roughly 11% of them trucks, projected to reach 808 by 2046. The structure is 60 ft (18.3 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 637 (ch 21) over Br of Flat Branch built?
It was built in 2023, making it 2 years old in 2025.
What condition is FAS 637 (ch 21) over Br of Flat Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does FAS 637 (ch 21) over Br of Flat Branch carry?
About 800 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is FAS 637 (ch 21) over Br of Flat Branch?
The structure is 60 ft (18.3 m) long with a longest span of 57 ft (17.3 m) and a deck 28 ft wide.
Who owns FAS 637 (ch 21) over Br of Flat Branch?
It is owned by the County Highway Agency.