US Bridges

TR 231 over Stream

Good

Shelby County, Illinois · 2 MI SW Tower Hill · Structure no. 087357000000000

Built
2010
15 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
71 ft
1 main span
Daily traffic
50
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 231 over Stream is a prestressed concrete box beam or girders - multiple carrying TR 231 over Stream in Shelby County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 6% of them trucks, projected to reach 76 by 2046. The structure is 71 ft (21.7 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesTR 231
CrossesStream
Location2 MI SW Tower Hill
RouteCounty Highway 0
Coordinates39.3613, -88.97513
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length71 ft (21.7 m)
Longest span69 ft (20.9 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic76 by 2046
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 231 over Stream built?

It was built in 2010, making it 15 years old in 2025.

What condition is TR 231 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does TR 231 over Stream carry?

About 50 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is TR 231 over Stream?

The structure is 71 ft (21.7 m) long with a longest span of 69 ft (20.9 m) and a deck 24 ft wide.

Who owns TR 231 over Stream?

It is owned by the Town or Township Highway Agency.