US Bridges

TR 21 over Flat Branch

Good

Shelby County, Illinois · 3 MI SE of Moweaqua · Structure no. 087350100000000

Built
1996
29 years old
Condition
Good
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
224 ft
3 main spans
Daily traffic
150
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 21 over Flat Branch is a prestressed concrete box beam or girders - multiple carrying TR 21 over Flat Branch in Shelby County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 3% of them trucks, projected to reach 101 by 2046. The structure is 224 ft (68.4 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 21
CrossesFlat Branch
Location3 MI SE of Moweaqua
RouteCounty Highway 0
Coordinates39.58127, -89.00007
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length224 ft (68.4 m)
Longest span74 ft (22.6 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2024)
Projected traffic101 by 2046
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 21 over Flat Branch built?

It was built in 1996, making it 29 years old in 2025.

What condition is TR 21 over Flat Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does TR 21 over Flat Branch carry?

About 150 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is TR 21 over Flat Branch?

The structure is 224 ft (68.4 m) long with a longest span of 74 ft (22.6 m) and a deck 24 ft wide.

Who owns TR 21 over Flat Branch?

It is owned by the Town or Township Highway Agency.