FAP 325(IL 16) over Richland Creek
GoodShelby County, Illinois · 2.3 MI W Il 32 · Structure no. 087002400000000
- Built
- 1980
- 45 years old, rebuilt 2019
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 4,250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 325(IL 16) over Richland Creek is a prestressed concrete box beam or girders - multiple carrying FAP 325(IL 16) over Richland Creek in Shelby County, Illinois. It was built in 1980 and reconstructed in 2019, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,250 vehicles a day, roughly 9% of them trucks, projected to reach 4,242 by 2046. The structure is 46 ft (14 m) long and 45 ft wide. If it were closed, the detour would be 42.3 mi (68 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 325(IL 16) over Richland Creek built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2019.
What condition is FAP 325(IL 16) over Richland Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does FAP 325(IL 16) over Richland Creek carry?
About 4,250 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is FAP 325(IL 16) over Richland Creek?
The structure is 46 ft (14 m) long with a longest span of 42 ft (12.9 m) and a deck 45 ft wide.
Who owns FAP 325(IL 16) over Richland Creek?
It is owned by the State Highway Agency.