TR 213A over Bn RR
PoorPosted for loadSchuyler County, Illinois · 3 MI SW of Bader · Structure no. 085990900000000
- Built
- 1900
- 125 years old
- Condition
- Poor
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 107 ft
- 7 main spans
- Daily traffic
- 25
- 2024 count
- Owner
- Railroad
- Railroad
About this bridge
TR 213A over Bn RR is a wood or timber stringer/multi-beam or girder carrying TR 213A over Bn RR in Schuyler County, Illinois. It was built in 1900, so it is 125 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 2 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 25 by 2046. The structure is 107 ft (32.6 m) long and 17 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 213A over Bn RR built?
It was built in 1900, making it 125 years old in 2025.
What condition is TR 213A over Bn RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.
How much traffic does TR 213A over Bn RR carry?
About 25 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is TR 213A over Bn RR?
The structure is 107 ft (32.6 m) long with a longest span of 22 ft (6.7 m) and a deck 17 ft wide.
Who owns TR 213A over Bn RR?
It is owned by the Railroad.