Park ST over Creek
GoodSangamon County, Illinois · 0.24 Park ST · Structure no. 084800700000000
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected April 2024
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 1,100
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Park ST over Creek is a concrete culvert carrying Park ST over Creek in Sangamon County, Illinois. It was built in 2002, so it is 23 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, projected to reach 1,111 by 2046. The structure is 22 ft (6.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Park ST over Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is Park ST over Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Park ST over Creek carry?
About 1,100 vehicles per day (2022 count).
How long is Park ST over Creek?
The structure is 22 ft (6.6 m) long with a longest span of 10 ft (3.1 m).
Who owns Park ST over Creek?
It is owned by the City or Municipal Highway Agency.