US Bridges

TR 138 over Panther Creek

Good

Sangamon County, Illinois · 2MI NW Thayer · Structure no. 084358600000000

Built
1997
28 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
75
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 138 over Panther Creek is a prestressed concrete box beam or girders - multiple carrying TR 138 over Panther Creek in Sangamon County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 27% of them trucks, projected to reach 76 by 2046. The structure is 30 ft (9.1 m) long and 36 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 138
CrossesPanther Creek
Location2MI NW Thayer
RouteCounty Highway 0
Coordinates39.56669, -89.78722
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span28 ft (8.4 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic76 by 2046
Trucks27%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 138 over Panther Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is TR 138 over Panther Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does TR 138 over Panther Creek carry?

About 75 vehicles per day (2022 count), of which roughly 27% are trucks.

How long is TR 138 over Panther Creek?

The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.4 m) and a deck 36 ft wide.

Who owns TR 138 over Panther Creek?

It is owned by the Town or Township Highway Agency.