TR 317 Br Pr 134 over S Fork Sangamon Rivr
GoodSangamon County, Illinois · 1.5 NE New City · Structure no. 084354400000000
- Built
- 1985
- 40 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 284 ft
- 4 main spans
- Daily traffic
- 200
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 317 Br Pr 134 over S Fork Sangamon Rivr is a prestressed concrete box beam or girders - multiple carrying TR 317 Br Pr 134 over S Fork Sangamon Rivr in Sangamon County, Illinois. It was built in 1985, so it is 40 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 200 vehicles a day, roughly 7% of them trucks, projected to reach 177 by 2046. The structure is 284 ft (86.5 m) long and 27 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 317 Br Pr 134 over S Fork Sangamon Rivr built?
It was built in 1985, making it 40 years old in 2025.
What condition is TR 317 Br Pr 134 over S Fork Sangamon Rivr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does TR 317 Br Pr 134 over S Fork Sangamon Rivr carry?
About 200 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is TR 317 Br Pr 134 over S Fork Sangamon Rivr?
The structure is 284 ft (86.5 m) long with a longest span of 77 ft (23.5 m) and a deck 27 ft wide.
Who owns TR 317 Br Pr 134 over S Fork Sangamon Rivr?
It is owned by the Town or Township Highway Agency.