US Bridges

TR 253 over Spring Creek

Good

Sangamon County, Illinois · 4 M W Berlin · Structure no. 084353200000000

Built
2007
18 years old
Condition
Good
inspected March 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
127 ft
3 main spans
Daily traffic
75
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 253 over Spring Creek is a prestressed concrete box beam or girders - multiple carrying TR 253 over Spring Creek in Sangamon County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 20% of them trucks, projected to reach 177 by 2046. The structure is 127 ft (38.6 m) long and 27 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesTR 253
CrossesSpring Creek
Location4 M W Berlin
RouteCounty Highway 0
Coordinates39.74342, -89.98274
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length127 ft (38.6 m)
Longest span42 ft (12.7 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic177 by 2046
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 253 over Spring Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is TR 253 over Spring Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does TR 253 over Spring Creek carry?

About 75 vehicles per day (2022 count), of which roughly 20% are trucks.

How long is TR 253 over Spring Creek?

The structure is 127 ft (38.6 m) long with a longest span of 42 ft (12.7 m) and a deck 27 ft wide.

Who owns TR 253 over Spring Creek?

It is owned by the Town or Township Highway Agency.