US Bridges

TR 134 over Sugar Creek Trib

Good

Sangamon County, Illinois · 0.62 MI W Il 4 · Structure no. 084324900000000

Built
2019
6 years old
Condition
Good
inspected March 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
53 ft
1 main span
Daily traffic
75
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 134 over Sugar Creek Trib is a prestressed concrete box beam or girders - multiple carrying TR 134 over Sugar Creek Trib in Sangamon County, Illinois. It was built in 2019, so it is 6 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 13% of them trucks, projected to reach 76 by 2046. The structure is 53 ft (16.1 m) long and 27 ft wide.

CarriesTR 134
CrossesSugar Creek Trib
Location0.62 MI W Il 4
RouteCounty Highway 0
Coordinates39.52753, -89.7783
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.4 US tons
Inventory rating47.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length53 ft (16.1 m)
Longest span50 ft (15.2 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2022)
Projected traffic76 by 2046
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 134 over Sugar Creek Trib built?

It was built in 2019, making it 6 years old in 2025.

What condition is TR 134 over Sugar Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does TR 134 over Sugar Creek Trib carry?

About 75 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is TR 134 over Sugar Creek Trib?

The structure is 53 ft (16.1 m) long with a longest span of 50 ft (15.2 m) and a deck 27 ft wide.

Who owns TR 134 over Sugar Creek Trib?

It is owned by the Town or Township Highway Agency.