TR 120 (8W) over South Fork Lick CR
GoodSangamon County, Illinois · 2.5 NE of Loami · Structure no. 084309300000000
- Built
- 1966
- 59 years old, rebuilt 2001
- Condition
- Good
- inspected March 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 184 ft
- 3 main spans
- Daily traffic
- 75
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 120 (8W) over South Fork Lick CR is a prestressed concrete box beam or girders - multiple carrying TR 120 (8W) over South Fork Lick CR in Sangamon County, Illinois. It was built in 1966 and reconstructed in 2001, so it is 59 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, projected to reach 76 by 2046. The structure is 184 ft (56.1 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 120 (8W) over South Fork Lick CR built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2001.
What condition is TR 120 (8W) over South Fork Lick CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.
How much traffic does TR 120 (8W) over South Fork Lick CR carry?
About 75 vehicles per day (2017 count).
How long is TR 120 (8W) over South Fork Lick CR?
The structure is 184 ft (56.1 m) long with a longest span of 62 ft (18.8 m) and a deck 27 ft wide.
Who owns TR 120 (8W) over South Fork Lick CR?
It is owned by the Town or Township Highway Agency.