US Bridges

FAU 9549-CHURCH ST over Ditch

Good

Saline County, Illinois · E of Capitol ST · Structure no. 083600400000000

Built
1985
40 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
200
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 9549-CHURCH ST over Ditch is a concrete culvert carrying FAU 9549-CHURCH ST over Ditch in Saline County, Illinois. It was built in 1985, so it is 40 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 7% of them trucks, projected to reach 202 by 2046. The structure is 22 ft (6.7 m) long and 41 ft wide.

CarriesFAU 9549-CHURCH ST
CrossesDitch
LocationE of Capitol ST
Coordinates37.73699, -88.55125
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width41 ft (12.6 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2020)
Projected traffic202 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 9549-CHURCH ST over Ditch built?

It was built in 1985, making it 40 years old in 2025.

What condition is FAU 9549-CHURCH ST over Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does FAU 9549-CHURCH ST over Ditch carry?

About 200 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is FAU 9549-CHURCH ST over Ditch?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 41 ft wide.

Who owns FAU 9549-CHURCH ST over Ditch?

It is owned by the City or Municipal Highway Agency.