Raleigh RD over Eldorado Resr Spway
GoodSaline County, Illinois · 1.25 MI E Raleigh · Structure no. 083006300000000
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 56 ft
- 1 main span
- Daily traffic
- 2,250
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Raleigh RD over Eldorado Resr Spway is a steel stringer/multi-beam or girder carrying Raleigh RD over Eldorado Resr Spway in Saline County, Illinois. It was built in 2009, so it is 16 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,250 vehicles a day, roughly 18% of them trucks, projected to reach 2,273 by 2046. The structure is 56 ft (17 m) long and 39 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Raleigh RD over Eldorado Resr Spway built?
It was built in 2009, making it 16 years old in 2025.
What condition is Raleigh RD over Eldorado Resr Spway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Raleigh RD over Eldorado Resr Spway carry?
About 2,250 vehicles per day (2020 count), of which roughly 18% are trucks.
How long is Raleigh RD over Eldorado Resr Spway?
The structure is 56 ft (17 m) long with a longest span of 54 ft (16.4 m) and a deck 39 ft wide.
Who owns Raleigh RD over Eldorado Resr Spway?
It is owned by the State Highway Agency.