US 45-FAP 332 over Middle Fork Saline R
GoodSaline County, Illinois · N of Harrisburg · Structure no. 083006200000000
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 256 ft
- 3 main spans
- Daily traffic
- 10,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 45-FAP 332 over Middle Fork Saline R is a steel continuous stringer/multi-beam or girder carrying US 45-FAP 332 over Middle Fork Saline R in Saline County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,200 vehicles a day, roughly 10% of them trucks, projected to reach 5,151 by 2046. The structure is 256 ft (78.1 m) long and 39 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 45-FAP 332 over Middle Fork Saline R built?
It was built in 2004, making it 21 years old in 2025.
What condition is US 45-FAP 332 over Middle Fork Saline R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does US 45-FAP 332 over Middle Fork Saline R carry?
About 10,200 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is US 45-FAP 332 over Middle Fork Saline R?
The structure is 256 ft (78.1 m) long with a longest span of 90 ft (27.4 m) and a deck 39 ft wide.
Who owns US 45-FAP 332 over Middle Fork Saline R?
It is owned by the State Highway Agency.