US Bridges

Douglas St/ FAU 92 over Richland Creek

Fair

St. Clair County, Illinois · Belleville · Structure no. 082610000000000

Built
1948
77 years old
Condition
Fair
inspected June 2024
Type
Culvert
Concrete
Length
22 ft
1 main span
Daily traffic
3,600
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Douglas St/ FAU 92 over Richland Creek is a concrete culvert carrying Douglas St/ FAU 92 over Richland Creek in St. Clair County, Illinois. It was built in 1948, so it is 77 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,600 vehicles a day, roughly 4% of them trucks, projected to reach 4,293 by 2046. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDouglas St/ FAU 92
CrossesRichland Creek
LocationBelleville
Coordinates38.52324, -89.98232
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating41.8 US tons
Inventory rating25 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,600 (2023)
Projected traffic4,293 by 2046
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Douglas St/ FAU 92 over Richland Creek built?

It was built in 1948, making it 77 years old in 2025.

What condition is Douglas St/ FAU 92 over Richland Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Douglas St/ FAU 92 over Richland Creek carry?

About 3,600 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Douglas St/ FAU 92 over Richland Creek?

The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m).

Who owns Douglas St/ FAU 92 over Richland Creek?

It is owned by the City or Municipal Highway Agency.