Etling Road over W. Fork Richland Ct.
GoodSt. Clair County, Illinois · 1MI East of Ch 9 · Structure no. 082414500000000
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 71 ft
- 1 main span
- Daily traffic
- 350
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Etling Road over W. Fork Richland Ct. is a prestressed concrete box beam or girders - multiple carrying Etling Road over W. Fork Richland Ct. in St. Clair County, Illinois. It was built in 2001, so it is 24 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 350 vehicles a day, roughly 6% of them trucks, projected to reach 202 by 2046. The structure is 71 ft (21.5 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Etling Road over W. Fork Richland Ct. built?
It was built in 2001, making it 24 years old in 2025.
What condition is Etling Road over W. Fork Richland Ct. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Etling Road over W. Fork Richland Ct. carry?
About 350 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is Etling Road over W. Fork Richland Ct.?
The structure is 71 ft (21.5 m) long with a longest span of 68 ft (20.6 m) and a deck 24 ft wide.
Who owns Etling Road over W. Fork Richland Ct.?
It is owned by the Town or Township Highway Agency.