Werner Rd/ FAU 925 over Southern RR
PoorSt. Clair County, Illinois · 0.3 MI E 74 ST · Structure no. 082402300000000
- Built
- 1960
- 65 years old
- Condition
- Poor
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 96 ft
- 3 main spans
- Daily traffic
- 525
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Werner Rd/ FAU 925 over Southern RR is a steel stringer/multi-beam or girder carrying Werner Rd/ FAU 925 over Southern RR in St. Clair County, Illinois. It was built in 1960, so it is 65 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 2 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, would be posted or closed except for temporary shoring.
It carries about 525 vehicles a day, roughly 9% of them trucks, projected to reach 455 by 2046. The structure is 96 ft (29.3 m) long and 33 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
| Substructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Werner Rd/ FAU 925 over Southern RR built?
It was built in 1960, making it 65 years old in 2025.
What condition is Werner Rd/ FAU 925 over Southern RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does Werner Rd/ FAU 925 over Southern RR carry?
About 525 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is Werner Rd/ FAU 925 over Southern RR?
The structure is 96 ft (29.3 m) long with a longest span of 32 ft (9.8 m) and a deck 33 ft wide.
Who owns Werner Rd/ FAU 925 over Southern RR?
It is owned by the Town or Township Highway Agency.