Davis St/ FAU 9301 over Fish Lake
GoodSt. Clair County, Illinois · 1.25MI W Ill RTE 3 · Structure no. 082305800000000
- Built
- 1974
- 51 years old, rebuilt 2011
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 82 ft
- 3 main spans
- Daily traffic
- 400
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Davis St/ FAU 9301 over Fish Lake is a prestressed concrete box beam or girders - multiple carrying Davis St/ FAU 9301 over Fish Lake in St. Clair County, Illinois. It was built in 1974 and reconstructed in 2011, so it is 51 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 400 vehicles a day, roughly 14% of them trucks, projected to reach 505 by 2046. The structure is 82 ft (25 m) long and 30 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Davis St/ FAU 9301 over Fish Lake built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 2011.
What condition is Davis St/ FAU 9301 over Fish Lake in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Davis St/ FAU 9301 over Fish Lake carry?
About 400 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is Davis St/ FAU 9301 over Fish Lake?
The structure is 82 ft (25 m) long with a longest span of 36 ft (11 m) and a deck 30 ft wide.
Who owns Davis St/ FAU 9301 over Fish Lake?
It is owned by the County Highway Agency.