Il 3 NB over 2 Future Trra Tracks
GoodSt. Clair County, Illinois · 0.5MI SW I-70 · Structure no. 082031400000000
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 200 ft
- 3 main spans
- Daily traffic
- 2,600
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Il 3 NB over 2 Future Trra Tracks is a steel continuous stringer/multi-beam or girder carrying Il 3 NB over 2 Future Trra Tracks in St. Clair County, Illinois. It was built in 2016, so it is 9 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 32% of them trucks, projected to reach 1,187 by 2046. The structure is 200 ft (61 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 3 NB over 2 Future Trra Tracks built?
It was built in 2016, making it 9 years old in 2025.
What condition is Il 3 NB over 2 Future Trra Tracks in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Il 3 NB over 2 Future Trra Tracks carry?
About 2,600 vehicles per day (2024 count), of which roughly 32% are trucks.
How long is Il 3 NB over 2 Future Trra Tracks?
The structure is 200 ft (61 m) long with a longest span of 74 ft (22.6 m) and a deck 41 ft wide.
Who owns Il 3 NB over 2 Future Trra Tracks?
It is owned by the State Highway Agency.