FAI 255 NB over Harding Ditch North
FairSt. Clair County, Illinois · 1.9MI N FAI 64 · Structure no. 082024500000000
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 347 ft
- 3 main spans
- Daily traffic
- 21,750
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 255 NB over Harding Ditch North is a steel continuous stringer/multi-beam or girder carrying FAI 255 NB over Harding Ditch North in St. Clair County, Illinois. It was built in 1985, so it is 40 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,750 vehicles a day, roughly 15% of them trucks, projected to reach 21,917 by 2046. The structure is 347 ft (105.8 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 255 NB over Harding Ditch North built?
It was built in 1985, making it 40 years old in 2025.
What condition is FAI 255 NB over Harding Ditch North in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does FAI 255 NB over Harding Ditch North carry?
About 21,750 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is FAI 255 NB over Harding Ditch North?
The structure is 347 ft (105.8 m) long with a longest span of 113 ft (34.4 m) and a deck 59 ft wide.
Who owns FAI 255 NB over Harding Ditch North?
It is owned by the State Highway Agency.