FAI 64 EB over Harding Ditch
FairSt. Clair County, Illinois · 1.04 MI E of Ill 111 · Structure no. 082016900000000
- Built
- 1968
- 57 years old, rebuilt 2012
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 111 ft
- 3 main spans
- Daily traffic
- 38,250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 64 EB over Harding Ditch is a steel continuous stringer/multi-beam or girder carrying FAI 64 EB over Harding Ditch in St. Clair County, Illinois. It was built in 1968 and reconstructed in 2012, so it is 57 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 38,250 vehicles a day, roughly 14% of them trucks, projected to reach 46,495 by 2046. The structure is 111 ft (33.9 m) long and 137 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 64 EB over Harding Ditch built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2012.
What condition is FAI 64 EB over Harding Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does FAI 64 EB over Harding Ditch carry?
About 38,250 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is FAI 64 EB over Harding Ditch?
The structure is 111 ft (33.9 m) long with a longest span of 41 ft (12.4 m) and a deck 137 ft wide.
Who owns FAI 64 EB over Harding Ditch?
It is owned by the State Highway Agency.