I-88 WB over Meredosia Ditch
FairRock Island County, Illinois · At Whiteside CO LN · Structure no. 081013400000000
- Built
- 1976
- 49 years old, rebuilt 2022
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 237 ft
- 3 main spans
- Daily traffic
- 6,250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-88 WB over Meredosia Ditch is a steel continuous stringer/multi-beam or girder carrying I-88 WB over Meredosia Ditch in Rock Island County, Illinois. It was built in 1976 and reconstructed in 2022, so it is 49 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,250 vehicles a day, roughly 33% of them trucks, projected to reach 7,121 by 2046. The structure is 237 ft (72.2 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-88 WB over Meredosia Ditch built?
It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2022.
What condition is I-88 WB over Meredosia Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I-88 WB over Meredosia Ditch carry?
About 6,250 vehicles per day (2023 count), of which roughly 33% are trucks.
How long is I-88 WB over Meredosia Ditch?
The structure is 237 ft (72.2 m) long with a longest span of 94 ft (28.6 m) and a deck 42 ft wide.
Who owns I-88 WB over Meredosia Ditch?
It is owned by the State Highway Agency.