US Bridges

TR-240 over Paul Creek

Fair

Richland County, Illinois · 3 MI N Claremont · Structure no. 080310400000000

Built
1909
116 years old, rebuilt 1971
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
22 ft
1 main span
Daily traffic
25
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-240 over Paul Creek is a steel stringer/multi-beam or girder carrying TR-240 over Paul Creek in Richland County, Illinois. It was built in 1909 and reconstructed in 1971, so it is 116 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 25 by 2046. The structure is 22 ft (6.7 m) long and 14 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR-240
CrossesPaul Creek
Location3 MI N Claremont
RouteCounty Highway 0
Coordinates38.7613, -87.95595
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating47.8 US tons
Inventory rating31.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span22 ft (6.7 m)
Deck width14 ft (4.3 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2022)
Projected traffic25 by 2046
Trucks8%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$7,000
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-240 over Paul Creek built?

It was built in 1909, making it 116 years old in 2025. It was reconstructed in 1971.

What condition is TR-240 over Paul Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does TR-240 over Paul Creek carry?

About 25 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is TR-240 over Paul Creek?

The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 14 ft wide.

Who owns TR-240 over Paul Creek?

It is owned by the Town or Township Highway Agency.