TR 50 - First Road over Horse Creek
GoodRandolph County, Illinois · 1.5 MI NE of Ruma · Structure no. 079437400000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 128 ft
- 3 main spans
- Daily traffic
- 75
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
TR 50 - First Road over Horse Creek is a prestressed concrete box beam or girders - multiple carrying TR 50 - First Road over Horse Creek in Randolph County, Illinois. It was built in 2022, so it is 3 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 13% of them trucks, projected to reach 75 by 2036. The structure is 128 ft (38.9 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 50 - First Road over Horse Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is TR 50 - First Road over Horse Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does TR 50 - First Road over Horse Creek carry?
About 75 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is TR 50 - First Road over Horse Creek?
The structure is 128 ft (38.9 m) long with a longest span of 50 ft (15.3 m) and a deck 24 ft wide.
Who owns TR 50 - First Road over Horse Creek?
It is owned by the County Highway Agency.