TR 75 over Trib Clear Creek
FairPutnam County, Illinois · 2.5 MI SW Mcnabb · Structure no. 078311300000000
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 75
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 75 over Trib Clear Creek is a prestressed concrete box beam or girders - multiple carrying TR 75 over Trib Clear Creek in Putnam County, Illinois. It was built in 1999, so it is 26 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 13% of them trucks, projected to reach 78 by 2046. The structure is 53 ft (16.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 75 over Trib Clear Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is TR 75 over Trib Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does TR 75 over Trib Clear Creek carry?
About 75 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is TR 75 over Trib Clear Creek?
The structure is 53 ft (16.3 m) long with a longest span of 51 ft (15.5 m) and a deck 24 ft wide.
Who owns TR 75 over Trib Clear Creek?
It is owned by the Town or Township Highway Agency.