US Bridges

TR 2 a over Sandy Creek

Fair

Putnam County, Illinois · 140N 1600E · Structure no. 078300400000000

Built
1940
85 years old, rebuilt 1984
Condition
Fair
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
50
2016 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 2 a over Sandy Creek is a prestressed concrete box beam or girders - multiple carrying TR 2 a over Sandy Creek in Putnam County, Illinois. It was built in 1940 and reconstructed in 1984, so it is 85 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 52 by 2046. The structure is 44 ft (13.4 m) long and 24 ft wide.

CarriesTR 2 a
CrossesSandy Creek
Location140N 1600E
RouteCounty Highway 0
Coordinates41.12527, -89.16235
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.3 US tons
Inventory rating46.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span41 ft (12.5 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2016)
Projected traffic52 by 2046
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 2 a over Sandy Creek built?

It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1984.

What condition is TR 2 a over Sandy Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does TR 2 a over Sandy Creek carry?

About 50 vehicles per day (2016 count).

How long is TR 2 a over Sandy Creek?

The structure is 44 ft (13.4 m) long with a longest span of 41 ft (12.5 m) and a deck 24 ft wide.

Who owns TR 2 a over Sandy Creek?

It is owned by the Town or Township Highway Agency.