US Bridges

TR 359 over Honey Creek

Fair

Pike County, Illinois · 2 M E Independence · Structure no. 075331800000000

Built
2011
14 years old
Condition
Fair
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
139 ft
3 main spans
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 359 over Honey Creek is a prestressed concrete box beam or girders - multiple carrying TR 359 over Honey Creek in Pike County, Illinois. It was built in 2011, so it is 14 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 58 by 2046. The structure is 139 ft (42.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 359
CrossesHoney Creek
Location2 M E Independence
RouteCounty Highway 0
Coordinates39.53017, -90.75274
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length139 ft (42.4 m)
Longest span68 ft (20.8 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic58 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 359 over Honey Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is TR 359 over Honey Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does TR 359 over Honey Creek carry?

About 50 vehicles per day (2023 count).

How long is TR 359 over Honey Creek?

The structure is 139 ft (42.4 m) long with a longest span of 68 ft (20.8 m) and a deck 28 ft wide.

Who owns TR 359 over Honey Creek?

It is owned by the Town or Township Highway Agency.