US Bridges

TR 386 over Bay Creek

Fair

Pike County, Illinois · 6.5 M S Time · Structure no. 075329500000000

Built
2004
21 years old
Condition
Fair
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
142 ft
3 main spans
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 386 over Bay Creek is a prestressed concrete box beam or girders - multiple carrying TR 386 over Bay Creek in Pike County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 58 by 2046. The structure is 142 ft (43.4 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 386
CrossesBay Creek
Location6.5 M S Time
RouteCounty Highway 0
Coordinates39.46349, -90.72435
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.8 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length142 ft (43.4 m)
Longest span70 ft (21.3 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic58 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 386 over Bay Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is TR 386 over Bay Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does TR 386 over Bay Creek carry?

About 50 vehicles per day (2023 count).

How long is TR 386 over Bay Creek?

The structure is 142 ft (43.4 m) long with a longest span of 70 ft (21.3 m) and a deck 27 ft wide.

Who owns TR 386 over Bay Creek?

It is owned by the Town or Township Highway Agency.