US Bridges

I-72/US 36 WB Ex R over Drainage Ditch

Fair

Pike County, Illinois · Il 96/HULL Intchg · Structure no. 075202600000000

Built
1987
38 years old
Condition
Fair
inspected January 2024
Type
Culvert
Concrete Continuous
Length
25 ft
3 main spans
Daily traffic
125
2023 count
Owner
State
State Highway Agency

About this bridge

I-72/US 36 WB Ex R over Drainage Ditch is a concrete continuous culvert carrying I-72/US 36 WB Ex R over Drainage Ditch in Pike County, Illinois. It was built in 1987, so it is 38 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 125 vehicles a day, roughly 23% of them trucks, projected to reach 174 by 2046. The structure is 25 ft (7.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-72/US 36 WB Ex R
CrossesDrainage Ditch
LocationIl 96/HULL Intchg
Coordinates39.72, -91.19448
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length25 ft (7.5 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2023)
Projected traffic174 by 2046
Trucks23%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-72/US 36 WB Ex R over Drainage Ditch built?

It was built in 1987, making it 38 years old in 2025.

What condition is I-72/US 36 WB Ex R over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does I-72/US 36 WB Ex R over Drainage Ditch carry?

About 125 vehicles per day (2023 count), of which roughly 23% are trucks.

How long is I-72/US 36 WB Ex R over Drainage Ditch?

The structure is 25 ft (7.5 m) long with a longest span of 8 ft (2.4 m).

Who owns I-72/US 36 WB Ex R over Drainage Ditch?

It is owned by the State Highway Agency.