US Bridges

TR 195 over Drain Ditch #3

Good

Piatt County, Illinois · 4.0 MI SW Voorhies · Structure no. 074321300000000

Built
1983
42 years old
Condition
Good
inspected January 2022
Type
Slab
Concrete Continuous
Length
62 ft
3 main spans
Daily traffic
25
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 195 over Drain Ditch #3 is a concrete continuous slab carrying TR 195 over Drain Ditch #3 in Piatt County, Illinois. It was built in 1983, so it is 42 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 25 by 2046. The structure is 62 ft (18.9 m) long and 26 ft wide.

CarriesTR 195
CrossesDrain Ditch #3
Location4.0 MI SW Voorhies
RouteCounty Highway 0
Coordinates39.83578, -88.64692
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span23 ft (7 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2020)
Projected traffic25 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 195 over Drain Ditch #3 built?

It was built in 1983, making it 42 years old in 2025.

What condition is TR 195 over Drain Ditch #3 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.

How much traffic does TR 195 over Drain Ditch #3 carry?

About 25 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is TR 195 over Drain Ditch #3?

The structure is 62 ft (18.9 m) long with a longest span of 23 ft (7 m) and a deck 26 ft wide.

Who owns TR 195 over Drain Ditch #3?

It is owned by the Town or Township Highway Agency.