US Bridges

TR 195 over Stream

Good

Piatt County, Illinois · 4. MI SE Cerro Gordo · Structure no. 074312900000000

Built
1963
62 years old, rebuilt 2000
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
25
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 195 over Stream is a prestressed concrete box beam or girders - multiple carrying TR 195 over Stream in Piatt County, Illinois. It was built in 1963 and reconstructed in 2000, so it is 62 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 25 by 2046. The structure is 44 ft (13.4 m) long and 26 ft wide.

CarriesTR 195
CrossesStream
Location4. MI SE Cerro Gordo
RouteCounty Highway 0
Coordinates39.83596, -88.69723
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.7 US tons
Inventory rating45.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 15
Structure length44 ft (13.4 m)
Longest span43 ft (13.1 m)
Deck width26 ft (7.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2020)
Projected traffic25 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$77,000
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 195 over Stream built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2000.

What condition is TR 195 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does TR 195 over Stream carry?

About 25 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is TR 195 over Stream?

The structure is 44 ft (13.4 m) long with a longest span of 43 ft (13.1 m) and a deck 26 ft wide.

Who owns TR 195 over Stream?

It is owned by the Town or Township Highway Agency.