US Bridges

FAP 758(IL 32) over Stream

Good

Piatt County, Illinois · 1.2 MI N of LA Place · Structure no. 074200400000000

Built
1996
29 years old
Condition
Good
inspected March 2022
Type
Culvert
Concrete
Length
22 ft
3 main spans
Daily traffic
1,450
2023 count
Owner
State
State Highway Agency

About this bridge

FAP 758(IL 32) over Stream is a concrete culvert carrying FAP 758(IL 32) over Stream in Piatt County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,450 vehicles a day, roughly 15% of them trucks, projected to reach 1,313 by 2046. The structure is 22 ft (6.6 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFAP 758(IL 32)
CrossesStream
Location1.2 MI N of LA Place
RouteState Highway 32
Coordinates39.81774, -88.72685
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length22 ft (6.6 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,450 (2023)
Projected traffic1,313 by 2046
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 758(IL 32) over Stream built?

It was built in 1996, making it 29 years old in 2025.

What condition is FAP 758(IL 32) over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does FAP 758(IL 32) over Stream carry?

About 1,450 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is FAP 758(IL 32) over Stream?

The structure is 22 ft (6.6 m) long with a longest span of 6 ft (1.8 m).

Who owns FAP 758(IL 32) over Stream?

It is owned by the State Highway Agency.