Sandpiper RD over Puncheon Creek
GoodPerry County, Illinois · 4.5 MI NE Tamaroa · Structure no. 073318800000000
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 20
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Sandpiper RD over Puncheon Creek is a prestressed concrete box beam or girders - multiple carrying Sandpiper RD over Puncheon Creek in Perry County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 25 by 2046. The structure is 67 ft (20.3 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sandpiper RD over Puncheon Creek built?
It was built in 2010, making it 15 years old in 2025.
What condition is Sandpiper RD over Puncheon Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Sandpiper RD over Puncheon Creek carry?
About 20 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Sandpiper RD over Puncheon Creek?
The structure is 67 ft (20.3 m) long with a longest span of 64 ft (19.5 m) and a deck 24 ft wide.
Who owns Sandpiper RD over Puncheon Creek?
It is owned by the Town or Township Highway Agency.