TR 233 over Trib to Beaucoup CR
FairPerry County, Illinois · 1.6 MI E Il 13 · Structure no. 073316400000000
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 123 ft
- 3 main spans
- Daily traffic
- 100
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 233 over Trib to Beaucoup CR is a prestressed concrete box beam or girders - multiple carrying TR 233 over Trib to Beaucoup CR in Perry County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 20% of them trucks, projected to reach 202 by 2046. The structure is 123 ft (37.4 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 233 over Trib to Beaucoup CR built?
It was built in 1997, making it 28 years old in 2025.
What condition is TR 233 over Trib to Beaucoup CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does TR 233 over Trib to Beaucoup CR carry?
About 100 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is TR 233 over Trib to Beaucoup CR?
The structure is 123 ft (37.4 m) long with a longest span of 61 ft (18.7 m) and a deck 24 ft wide.
Who owns TR 233 over Trib to Beaucoup CR?
It is owned by the Town or Township Highway Agency.