CO HWY 8 over Trib to Little Muddy
FairPerry County, Illinois · W of Franklin CO · Structure no. 073311500000000
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 102 ft
- 3 main spans
- Daily traffic
- 250
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CO HWY 8 over Trib to Little Muddy is a prestressed concrete box beam or girders - multiple carrying CO HWY 8 over Trib to Little Muddy in Perry County, Illinois. It was built in 1981, so it is 44 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 250 vehicles a day, roughly 24% of them trucks, projected to reach 278 by 2046. The structure is 102 ft (31.1 m) long and 30 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO HWY 8 over Trib to Little Muddy built?
It was built in 1981, making it 44 years old in 2025.
What condition is CO HWY 8 over Trib to Little Muddy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does CO HWY 8 over Trib to Little Muddy carry?
About 250 vehicles per day (2024 count), of which roughly 24% are trucks.
How long is CO HWY 8 over Trib to Little Muddy?
The structure is 102 ft (31.1 m) long with a longest span of 44 ft (13.4 m) and a deck 30 ft wide.
Who owns CO HWY 8 over Trib to Little Muddy?
It is owned by the County Highway Agency.