US Bridges

FAP 103-IL 13 over Galum Creek

Good

Perry County, Illinois · 1 MI E Randolph CO · Structure no. 073200500000000

Built
2001
24 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
2,100
2023 count
Owner
State
State Highway Agency

About this bridge

FAP 103-IL 13 over Galum Creek is a concrete culvert carrying FAP 103-IL 13 over Galum Creek in Perry County, Illinois. It was built in 2001, so it is 24 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,100 vehicles a day, roughly 7% of them trucks, projected to reach 2,222 by 2046. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 21.7 mi (35 km).

CarriesFAP 103-IL 13
CrossesGalum Creek
Location1 MI E Randolph CO
RouteState Highway 13
Coordinates38.17704, -89.57561
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.2 US tons
Inventory rating41.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length31 ft (9.4 m)
Longest span13 ft (4.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,100 (2023)
Projected traffic2,222 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAP 103-IL 13 over Galum Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is FAP 103-IL 13 over Galum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does FAP 103-IL 13 over Galum Creek carry?

About 2,100 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is FAP 103-IL 13 over Galum Creek?

The structure is 31 ft (9.4 m) long with a longest span of 13 ft (4.1 m).

Who owns FAP 103-IL 13 over Galum Creek?

It is owned by the State Highway Agency.