US 51-FAP322 over Chstnt-Cnic-Oak-Alley
FairPerry County, Illinois · Near Downtwn Duquoin · Structure no. 073003300000000
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 806 ft
- 15 main spans
- Daily traffic
- 4,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 51-FAP322 over Chstnt-Cnic-Oak-Alley is a prestressed concrete continuous stringer/multi-beam or girder carrying US 51-FAP322 over Chstnt-Cnic-Oak-Alley in Perry County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,400 vehicles a day, roughly 7% of them trucks, projected to reach 4,394 by 2046. The structure is 806 ft (245.7 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 51-FAP322 over Chstnt-Cnic-Oak-Alley built?
It was built in 1997, making it 28 years old in 2025.
What condition is US 51-FAP322 over Chstnt-Cnic-Oak-Alley in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does US 51-FAP322 over Chstnt-Cnic-Oak-Alley carry?
About 4,400 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is US 51-FAP322 over Chstnt-Cnic-Oak-Alley?
The structure is 806 ft (245.7 m) long with a longest span of 65 ft (19.8 m) and a deck 33 ft wide.
Who owns US 51-FAP322 over Chstnt-Cnic-Oak-Alley?
It is owned by the State Highway Agency.