US Bridges

FAU-6595 over Dry Run Creek

Good

Peoria County, Illinois · 0.10 Mi. N. of I-74 · Structure no. 072601300000000

Built
2016
9 years old
Condition
Good
inspected September 2023
Type
Frame
Concrete
Length
36 ft
1 main span
Daily traffic
2,975
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU-6595 over Dry Run Creek is a concrete frame carrying FAU-6595 over Dry Run Creek in Peoria County, Illinois. It was built in 2016, so it is 9 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,975 vehicles a day, roughly 3% of them trucks, projected to reach 2,550 by 2046. The structure is 36 ft (11.1 m) long and 5 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAU-6595
CrossesDry Run Creek
Location0.10 Mi. N. of I-74
Coordinates40.70791, -89.60358
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length36 ft (11.1 m)
Longest span36 ft (11.1 m)
Deck width5 ft (1.5 m)
Roadway width5 ft (1.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,975 (2022)
Projected traffic2,550 by 2046
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU-6595 over Dry Run Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is FAU-6595 over Dry Run Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does FAU-6595 over Dry Run Creek carry?

About 2,975 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is FAU-6595 over Dry Run Creek?

The structure is 36 ft (11.1 m) long with a longest span of 36 ft (11.1 m) and a deck 5 ft wide.

Who owns FAU-6595 over Dry Run Creek?

It is owned by the City or Municipal Highway Agency.