Todd School Road over Br Copperas Creek
FairPeoria County, Illinois · NE1/4-6-TIMBER Twp · Structure no. 072314400000000
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 82 ft
- 1 main span
- Daily traffic
- 150
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Todd School Road over Br Copperas Creek is a prestressed concrete box beam or girders - multiple carrying Todd School Road over Br Copperas Creek in Peoria County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 19% of them trucks, projected to reach 177 by 2046. The structure is 82 ft (25 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Todd School Road over Br Copperas Creek built?
It was built in 2010, making it 15 years old in 2025.
What condition is Todd School Road over Br Copperas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Todd School Road over Br Copperas Creek carry?
About 150 vehicles per day (2022 count), of which roughly 19% are trucks.
How long is Todd School Road over Br Copperas Creek?
The structure is 82 ft (25 m) long with a longest span of 78 ft (23.9 m) and a deck 32 ft wide.
Who owns Todd School Road over Br Copperas Creek?
It is owned by the County Highway Agency.