University Ave over I74 & Dry Run Creek
FairPeoria County, Illinois · University Ave Inter · Structure no. 072018900000000
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 235 ft
- 2 main spans
- Daily traffic
- 13,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
University Ave over I74 & Dry Run Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying University Ave over I74 & Dry Run Creek in Peoria County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,500 vehicles a day, roughly 4% of them trucks, projected to reach 16,968 by 2046. The structure is 235 ft (71.5 m) long and 80 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was University Ave over I74 & Dry Run Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is University Ave over I74 & Dry Run Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does University Ave over I74 & Dry Run Creek carry?
About 13,500 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is University Ave over I74 & Dry Run Creek?
The structure is 235 ft (71.5 m) long with a longest span of 117 ft (35.8 m) and a deck 80 ft wide.
Who owns University Ave over I74 & Dry Run Creek?
It is owned by the State Highway Agency.