Chamberlain Rd. over Drainage Ditch
GoodPosted for loadOgle County, Illinois · 5.3 S.E. Lindenwood · Structure no. 071320600000000
- Built
- 1963
- 62 years old
- Condition
- Good
- inspected July 2023
- Type
- Slab
- Concrete Continuous
- Length
- 73 ft
- 3 main spans
- Daily traffic
- 25
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Chamberlain Rd. over Drainage Ditch is a concrete continuous slab carrying Chamberlain Rd. over Drainage Ditch in Ogle County, Illinois. It was built in 1963, so it is 62 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, projected to reach 26 by 2046. The structure is 73 ft (22.3 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chamberlain Rd. over Drainage Ditch built?
It was built in 1963, making it 62 years old in 2025.
What condition is Chamberlain Rd. over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Chamberlain Rd. over Drainage Ditch carry?
About 25 vehicles per day (2017 count).
How long is Chamberlain Rd. over Drainage Ditch?
The structure is 73 ft (22.3 m) long with a longest span of 22 ft (6.7 m) and a deck 28 ft wide.
Who owns Chamberlain Rd. over Drainage Ditch?
It is owned by the Town or Township Highway Agency.