Il 64 over Drainage Ditch
FairOgle County, Illinois · 5.7 MI E JCT Ill 26 · Structure no. 071001500000000
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected November 2023
- Type
- Slab
- Concrete Continuous
- Length
- 46 ft
- 2 main spans
- Daily traffic
- 1,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 64 over Drainage Ditch is a concrete continuous slab carrying Il 64 over Drainage Ditch in Ogle County, Illinois. It was built in 1955, so it is 70 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,500 vehicles a day, roughly 17% of them trucks, projected to reach 1,456 by 2046. The structure is 46 ft (14 m) long and 42 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 64 over Drainage Ditch built?
It was built in 1955, making it 70 years old in 2025.
What condition is Il 64 over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Il 64 over Drainage Ditch carry?
About 1,500 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is Il 64 over Drainage Ditch?
The structure is 46 ft (14 m) long with a longest span of 22 ft (6.7 m) and a deck 42 ft wide.
Who owns Il 64 over Drainage Ditch?
It is owned by the State Highway Agency.