US Bridges

TR 158 over Drainage Ditch

Good

Moultrie County, Illinois · 3.2 MI NW Arthur · Structure no. 070453600000000

Built
2014
11 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
50
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 158 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying TR 158 over Drainage Ditch in Moultrie County, Illinois. It was built in 2014, so it is 11 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 53 by 2046. The structure is 52 ft (15.7 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 158
CrossesDrainage Ditch
Location3.2 MI NW Arthur
RouteCounty Highway 0
Coordinates39.75102, -88.51039
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length52 ft (15.7 m)
Longest span49 ft (14.9 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2020)
Projected traffic53 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 158 over Drainage Ditch built?

It was built in 2014, making it 11 years old in 2025.

What condition is TR 158 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does TR 158 over Drainage Ditch carry?

About 50 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is TR 158 over Drainage Ditch?

The structure is 52 ft (15.7 m) long with a longest span of 49 ft (14.9 m) and a deck 27 ft wide.

Who owns TR 158 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.