US Bridges

TR 25 over Drainage Ditch

Good

Moultrie County, Illinois · 1.4 MI W of Arthur · Structure no. 070453400000000

Built
2007
18 years old
Condition
Good
inspected January 2022
Type
Frame
Concrete
Length
26 ft
1 main span
Daily traffic
150
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 25 over Drainage Ditch is a concrete frame carrying TR 25 over Drainage Ditch in Moultrie County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 16% of them trucks, projected to reach 158 by 2046. The structure is 26 ft (8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 25
CrossesDrainage Ditch
Location1.4 MI W of Arthur
RouteCounty Highway 0
Coordinates39.72472, -88.49635
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length26 ft (8 m)
Longest span25 ft (7.6 m)
Deck width0 ft (0 m)
Roadway width19 ft (5.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2020)
Projected traffic158 by 2046
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 25 over Drainage Ditch built?

It was built in 2007, making it 18 years old in 2025.

What condition is TR 25 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.

How much traffic does TR 25 over Drainage Ditch carry?

About 150 vehicles per day (2020 count), of which roughly 16% are trucks.

How long is TR 25 over Drainage Ditch?

The structure is 26 ft (8 m) long with a longest span of 25 ft (7.6 m).

Who owns TR 25 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.