US Bridges

TR 101 over Jonathan Creek

Good

Moultrie County, Illinois · 3 Mi. NE Sullivan · Structure no. 070433300000000

Built
2007
18 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
95 ft
2 main spans
Daily traffic
35
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 101 over Jonathan Creek is a prestressed concrete box beam or girders - multiple carrying TR 101 over Jonathan Creek in Moultrie County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35 vehicles a day, roughly 6% of them trucks, projected to reach 37 by 2046. The structure is 95 ft (29.1 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTR 101
CrossesJonathan Creek
Location3 Mi. NE Sullivan
RouteCounty Highway 0
Coordinates39.62376, -88.53845
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length95 ft (29.1 m)
Longest span24 ft (7.3 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2020)
Projected traffic37 by 2046
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 101 over Jonathan Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is TR 101 over Jonathan Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does TR 101 over Jonathan Creek carry?

About 35 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is TR 101 over Jonathan Creek?

The structure is 95 ft (29.1 m) long with a longest span of 24 ft (7.3 m) and a deck 27 ft wide.

Who owns TR 101 over Jonathan Creek?

It is owned by the Town or Township Highway Agency.