Ch 8(FAS 659) over Jonathan Creek
FairMoultrie County, Illinois · 3 MI S of Cadwell · Structure no. 070004100000000
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 61 ft
- 1 main span
- Daily traffic
- 2,100
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Ch 8(FAS 659) over Jonathan Creek is a steel stringer/multi-beam or girder carrying Ch 8(FAS 659) over Jonathan Creek in Moultrie County, Illinois. It was built in 1986, so it is 39 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,100 vehicles a day, roughly 10% of them trucks, projected to reach 2,205 by 2046. The structure is 61 ft (18.7 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 8(FAS 659) over Jonathan Creek built?
It was built in 1986, making it 39 years old in 2025.
What condition is Ch 8(FAS 659) over Jonathan Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Ch 8(FAS 659) over Jonathan Creek carry?
About 2,100 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Ch 8(FAS 659) over Jonathan Creek?
The structure is 61 ft (18.7 m) long with a longest span of 58 ft (17.7 m) and a deck 35 ft wide.
Who owns Ch 8(FAS 659) over Jonathan Creek?
It is owned by the State Highway Agency.