FAP 758(IL 32) over Jonathan Branch
FairMoultrie County, Illinois · 1.3 MI S Lovington · Structure no. 070003300000000
- Built
- 1975
- 50 years old, rebuilt 2007
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 1,350
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 758(IL 32) over Jonathan Branch is a prestressed concrete box beam or girders - multiple carrying FAP 758(IL 32) over Jonathan Branch in Moultrie County, Illinois. It was built in 1975 and reconstructed in 2007, so it is 50 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,350 vehicles a day, roughly 16% of them trucks, projected to reach 1,628 by 2046. The structure is 50 ft (15.3 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 758(IL 32) over Jonathan Branch built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2007.
What condition is FAP 758(IL 32) over Jonathan Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does FAP 758(IL 32) over Jonathan Branch carry?
About 1,350 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is FAP 758(IL 32) over Jonathan Branch?
The structure is 50 ft (15.3 m) long with a longest span of 48 ft (14.7 m) and a deck 32 ft wide.
Who owns FAP 758(IL 32) over Jonathan Branch?
It is owned by the State Highway Agency.