Il 133 (fap 749) over Drainage Ditch
FairMoultrie County, Illinois · W Edge of Arthur · Structure no. 070001600000000
- Built
- 1929
- 96 years old, rebuilt 2006
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 3,650
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 133 (fap 749) over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying Il 133 (fap 749) over Drainage Ditch in Moultrie County, Illinois. It was built in 1929 and reconstructed in 2006, so it is 96 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,650 vehicles a day, roughly 15% of them trucks, projected to reach 3,570 by 2046. The structure is 45 ft (13.6 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 133 (fap 749) over Drainage Ditch built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 2006.
What condition is Il 133 (fap 749) over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Il 133 (fap 749) over Drainage Ditch carry?
About 3,650 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is Il 133 (fap 749) over Drainage Ditch?
The structure is 45 ft (13.6 m) long with a longest span of 42 ft (12.7 m) and a deck 41 ft wide.
Who owns Il 133 (fap 749) over Drainage Ditch?
It is owned by the State Highway Agency.